Building a new home can be intimidating if you’ve never done it before. Our hands-on approach works wonders to help alleviate some of the stress. Fountain Homes’ knowledgeable staff is with you every step of the way. We’ll walk you through the entire building process, ensuring that you’re satisfied with both the end result and the measures we take to get there.

Step 1: General Conditions & Application to Build
      • Finalize design plans and homesite location
      • Contract ratification
      • Application for building permit

Step 2: Site Work & Foundation
      • Homesite clearing
      • Home location & stake-out
      • Excavation
      • Pour foundation
      • Homesite grading

Step 3: Framing & Dry-In
      • Framing
      • Roof installation
      • Windows & exterior doors installed
      • Insulation

Step 4: Exterior Finishes
      • Brick & stone installation
      • Siding & dryvit installed
      • Shingles in place
      • Exterior lighting installed
      • Landscaping

Step 5: Interior Finishes
      • Mechanical location selection
      • Drywall installed
      • Painting of walls & trim
      • Interior doors installed

Step 6: Interior Selections
      • Flooring selection and installation—hardwood, tile, vinyl, & carpet
      • Cabinetry & countertops selected and installed
      • Fireplace(s)
      • Interior lighting selected and installed
      • Appliances installed

Step 7: Final Acceptance
      •  Final inspections conducted
      •  Final cleaning of the home
      •  Final client walk thru
      •  Settlement

 